Redundant CPU data tracking cable length of 1 meters.
Can only be used for MITSUBISHI Q series PLC redundancy CPU.Input voltage range: AC100-240V.
Output voltage: DC5V.
Output power: 8.5A.
Simplified program debugging.
Can use the software with the implementation of the conditions of the test function, any step in the program,
Changes the value of the soft component to a user specified value QX82 Manual QX82 User's Manual
QX82
In the past, when debugging the specific loop process, the need to add a set of soft components of the program,
At present, through the use of the function, no need to change the program, you can make a specific loop program segment execution action.
Therefore, do not need to change the program separately in order to debug, debugging operation is more simple QX82 Manual QX82 User's Manual.
Through the expansion of soft components, more convenient to create the program.
M soft components and B soft components can be expanded to 60K points, making the program easier to understand.
Auto backup key data.
Save the program and parameter files automatically to the program memory (ROM Flash) without using the backup battery,
To prevent the loss of the program and the parameters due to forgetting to replace the battery QX82 Manual QX82 User's Manual.
In addition, the soft component data and other important data can be backed up to the standard ROM,
In order to avoid during the long holiday and other planned downtime,
The data is lost due to battery depletion.
The next time the power is turned on, the backup data will be automatically restored.Express PCI bus.
Support Japanese, English OS.
Multimode fiber optic cable.
Dual loop controller network (control station / common station).
With external power supply function.
Make the mixed data environment intelligent, to achieve a new manufacturing system IE CC-Link field network module.
Using Ethernet cables and connectors available on the market to reduce costs.
High speed communication capable of communicating with 1Gbps.
Improve the communication response, significantly shorten the cycle time.
Improve the performance of cycle data update. Reduces the transmission delay time and the application of the synchronization waiting time.
Data can be read or written to other station programmable controller.
Status of IE CC-Link field network can be confirmed by Works2 GX.
Can be in the Works2 GX up and down the abnormal position, the cause of the exception, the event record,
So it can reduce the time of abnormal to resume normal operation.
MELSECNET/H network module capable of composing large scale flexible network system.
The MELSECNET/H network system includes the PLC network of the control station and the communication between the stations and the remote I/O network in the remote station remote I/O station.
Optical fiber loop system...... High speed communication of 10Mbps/25Mbps is realized.
The distance between stations, the length of the total cable length, strong anti-interference QX82 Manual QX82 User's Manual.
Coaxial bus system...... Using low cost coaxial cable, the network construction cost is lower than that of the optical fiber loop network.
Twisted pair bus system QX82 Manual QX82 User's Manual. ..... Combined with high performance price ratio network module and twisted pair cable,
The construction cost of network system is very low.