MITSUBISHI
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A960GOT-EBA-EU Manual A960GOT-EBA-EU User's Manual

MITSUBISHI A960GOT-EBA-EU Manual A960GOT-EBA-EU User's Manual

Brand: MITSUBISHI
Product model: A960GOT-EBA-EU
Name: touch screen
Sort: User's Manual
File language: English
File size: 5.11MB
Input type: DC input, positive public end / negative public end.
Input points: 16 points.
Enter the response time: 10ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function: No A960GOT-EBA-EU Manual A960GOT-EBA-EU User's Manual.
Rated load voltage / current: DC24V/DC24V/0 A960GOT-EBA-EU5A.
External connection: 1 line /1 line type.
A2C shape terminal.
Type of input and output terminal.
Shape and A2C input and output modules are identical (same mounting dimensions),
Machining and installing holes are not required. Input type: DC input, positive public end / negative public end.
Input points: 32 points.
Enter the response time: 0 A960GOT-EBA-EU Manual A960GOT-EBA-EU User's Manual. 2ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 1 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program A960GOT-EBA-EU Manual A960GOT-EBA-EU User's Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Output points: 8 points.
Output voltage and current: DC12/24V.
Output response time: 2ms.
8 point /1 a public side.
Output form: transistor output, leakage type.
24 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic ideaa of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A960GOT-EBA-EU Manual A960GOT-EBA-EU User's Manual A960GOT-EBA-EU Manual A960GOT-EBA-EU User's Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
Related products
MITSUBISHI
9 inch man machine interface
A960GOT-EBA-EU
MITSUBISHI 9 inch man machine interface A960GOT-EBA-EU
Series Name: A960GOT. Size: 9 inches. Resolut
MITSUBISHI
9 inch man machine interface
A960GOT-EBD
MITSUBISHI 9 inch man machine interface A960GOT-EBD
Series Name: A960GOT. Size: 9 inches. Resolut
MITSUBISHI
9 inch man machine interface
A960GOT-EBA
MITSUBISHI 9 inch man machine interface A960GOT-EBA
Series Name: A960GOT. Size: 9 inches. Resolut