MITSUBISHI
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A1SX71 Manual A1SX71 User's Manual

MITSUBISHI A1SX71 Manual A1SX71 User's Manual

Brand: MITSUBISHI
Product model: A1SX71
Name: I/O Module
Sort: User's Manual
File language: English
File size: 5.14MB
Temperature sensor: PT100, 3 wire system.
The A1S62RD3 and A1S62RD4 temperature sensor input modules allow the platinum resistance temperature sensing element to be directly connected to the PLC,
This component converts a signal from a temperature measuring element to a numeric value that represents a temperature measurement value,
This temperature value can be used for the control process A1SX71 Manual A1SX71 User's Manual A1SX71
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of A1SX71 Manual A1SX71 User's Manual.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on A1SX71 Manual A1SX71 User's Manual.
This phenomenon is called the I/O delay time effect. Input points: 16 points.
Voltage: DC12/24V.
Current: 4/10mA.
Response time: 10ms.
32 points / a common end.
Negative utility.
20 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image regisster are changed with the change of the execution of the program A1SX71 Manual A1SX71 User's Manual.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to thhe adoption of centralized sampling A1SX71 Manual A1SX71 User's Manual.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
Related products