Screw terminal table type.
High precision / high resolution / high speed 2 piece type terminal.
Voltage / current output module.
Number of channels: 2 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction A1SH42P datasheet PDF catalog A1SH42P PDF datasheet
A1SH42P
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced A1SH42P datasheet PDF catalog A1SH42P PDF datasheet.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step A1SH42P datasheet PDF catalog A1SH42P PDF datasheet.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be. Output type: transistor output, source.
Output points: 16 points.
OFF leakage current: 0.30mA.
Output protection function.
Rated load voltage / current: DC12V/DC24V/0.1A.
External connection: 2 wire.
Waterproof connector type.
Strong waterproof type of IP67 protection grade.
No need to stop the system can be replaced module.
Without the use of tools can be a simple connection, save time.
Terminal resistor built-in.
Can be installed along the 6 direction.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Softwarre simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too guarantee the timeliness A1SH42P datasheet PDF catalog A1SH42P PDF datasheet A1SH42P datasheet PDF catalog A1SH42P PDF datasheet.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.