MITSUBISHI AJ35PTC-CNV Product information and technical parameters:
Brand: MITSUBISHI
Name: Melsecnet module
Model: AJ35PTC-CNV
MELSECNET/MINI (-S3) data link system, A2C system transfer converter.
Twisted pair cable - plastic optical fiber cable.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.

Output points: 16 points.
Output voltage and current: DC12/24V.
Output response time: 2ms.
16 point /1 a public side.
Output form: transistor output, leakage type.
40 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered MITSUBISHI AJ35PTC-CNV.
It can avoid the control logic confusion caused by illegal operations AJ35PTC-CNV
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc MITSUBISHI AJ35PTC-CNV. .
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation MITSUBISHI AJ35PTC-CNV. DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
8 point /1 a public side.
Positive / negative sharing.
Output points: 8 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 5A/1 common end.
Response time: 12ms.
8 point /1 a public side.
Output form: relay output.
34 point terminal station.
Number of stations: 2 stops.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired waay, and the timeliness is strong AJ35PTC-CNV.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy too guarantee the timeliness AJ35PTC-CNV.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.