MITSUBISHI
Home >> Price >> MITSUBISHI >> SW3RNC-GSVPROE Market price | SW3RNC-GSVPROE Introduction
Brand sort

MITSUBISHI SW3RNC-GSVPROE Market price | SW3RNC-GSVPROE Introduction

No PHOTO
Country: JAPAN
Name:
Market price: U.S.$ 4535.59
(The following are the market open price not sales price!)
MITSUBISHI SW3RNC-GSVPROE
4 axes, open collector output type.
Control unit: pulse.
Location data: 10 data / axis.
Maximum pulse output: 200Kpps.
40 pin connector.
Ideal solution for simple multi axis positioning.
Perfect match with stepper motor control.
Plus deceleration smooth, speed change subtle.
To speed up the speed of positioning control to start processing.
Positioning module.
Open collector output.
Differential driver output SW3RNC-GSVPROE
Based on the use of open collector outputs and differential drive output type 2 types.
Differential driver output type positioning module can transmit high speed instruction pulse (up to 4Mpps) to the servo amplifier reliably,
Transmission distance of up to 10 meters, to achieve high speed and high precision control.
(the command pulse of the open collector positioning module is highest 200kpps.)
Reduce system downtime recovery time.
With a simple operation, you can back up all the data in the CPU to the memory card.
Through regular backup, can be the latest parameters, procedures, etc. to save the storage card.
In the event of a CPU failure, after the replacement of CPU, can be a simple operation,
Restore the system by using the data storage card in advance.
Therefore, it is not necessary to spend time to manage the backup data, but also can shorten the recovery time of the system shutdown. 3C-2V/5C-2V coaxial cable between double loop PC (control station / common station) / remote I/O network (remote master station).
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on.
This phenomenon is called the I/O delay time effect.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
SW3RNC-GSVPROE Operation manual / Instructions / Catalog download link: /searchDownload.html?Search=SW3RNC-GSVPROE&select=5


...more relevant model market price >>>>
Related products
Related download