"Input points: 16 points.
Rated input voltage, frequency: AC100 ~ 120V, 50/60Hz.
Rated input current: 8.2mA (AC100V, 60Hz), 6.8mA (AC100V, 50Hz).
Response time: 20ms.
Common way: 16 point / public end.
Interrupt function: have.
External wiring connection mode: 18 point screw terminal.
The input and output module is the interface between the switch, sensor, actuator, and other control system of the ON/OFF signal processing
HG-KN13J-S100
Compared with the previous series, iQ-R MELSEC series of input and output modules have more features,
1 modules can be used for a variety of purposes, to help reduce the cost of deployment and maintenance costs.
The module design of the pursuit of convenience".
Paste the white label on the input module and paste the red label on the output module,
The rated specifications are clearly marked on the front of the module, which can prevent the use of errors.
The input and output number stamped on the top of the front display input and output module LED, can easily confirm the status of the ON/OFF.
The terminal arrangement of each signal is recorded on the wiring terminal of the 16 point module, and the false wiring can be prevented.
The 64 point module can be 32 points as the unit, through the switch to switch to display the input and output number.
In addition, serial number tag in the front of the module, can be easily recognized. "Cable length: 3m.
For QnA/ACPU/ motion controller CPU (A Series) /FXCPU. Connection between (D-SUB25 pin connector) and GOT.
For the connection between FA-CNV*CBL and GOT.
Connector for serial communication unit and GOT.
For the connection between AJ65BT-G4-S3 and GOT.
Applicable models: GT16, GT15, GT11, HandyGOT, GT10, GT27, GT25, GT23,, GT21. 3C-2V/5C-2V coaxial cable between the single bus PC network (control station / common station) / remote I/O network (remote master).
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on.
This phenomenon is called the I/O delay time effect.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
HG-KN13J-S100 Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=HG-KN13J-S100&select=5