Type: HA-FH series.
Rated output: 0.2KW.
Rated speed: 3000r/min.
Electromagnetic brake: there.
From the vector control technology of AC servo motor, it has become more and more popular.
From the point of view of the real time operating system, it is just a function module that needs to be processed in real time.
Due to the multi function of the controller, intelligent requirements, a large number of signal processing,
Establishment and operation of various mathematical models of adaptive control,
Network communications and other functional modules will be in the real-time operation of the unified scheduling and management of the system to get the correct and reliable operation
FX-8EYS
Therefore, the next generation of servo drive controller will be a collection of various modern control technology of the crystallization,
Instead of the traditional sense of power amplifier. Motor series: medium inertia, medium capacity.
Using a serial absolute / incremental encoder.
Rated output power: 1.2kw.
Rated speed: 1000rpm.
With a brake band.
Shaft end: straight shaft.
The structure of the AC servo motor stator is basically similar to the capacitor split phase single-phase induction motor.
The stator is provided with two positions of 90 degrees of mutual difference of the winding, one is the excitation winding Rf, it is always connected to the AC voltage Uf;
The other is to control the winding L, which is connected to the control signal voltage Uc.
So the AC servo motor, also known as the two servo motor. DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Input response time: 10ms.
8 point /1 a public side.
Positive pole sharing.
Output points: 8 points.
Output voltage and current: DC24V.
Output response time: 2ms.
8 point /1 a public side.
Output form: transistor output, leakage type.
40 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
FX-8EYS Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=FX-8EYS&select=5