Control axis: maximum 32 axes.
Teaching running function: there (when using SV13).
Compact size and space saving.
Using the same hardware structure and MELSEC-Q series PLC, to achieve the same product installation area, the size of the industry.
Using 12 slot substrate, more space and cost savings.
Can share PLC MELSEC-Q power module, substrate, and I/O module.
The control process can be assigned to each CPU module in the multi CPU system, which is equivalent to the intelligent control system
WS0-4RO
In PC (Computer Personal) CPU.Output type: bidirectional thyristor output.
Output points: 8 points.
OFF leakage current: 1.5mA following (AC100V) below /3mA (AC200V).
Output protection function: No.
Rated load voltage / current: AC100V~240V/0.6A.
External connection: 2 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup.
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool. DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Input response time: 10ms.
8 point /1 a public side.
Positive / negative sharing.
Output points: 8 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 8A/1 common end.
Output response time: 12ms.
8 point /1 a public side.
Output form: relay.
40 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
WS0-4RO Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=WS0-4RO&select=5