MITSUBISHI inverter series: FR-F840.
Voltage level: three phase 400V.
Power: 15.0kw.
SLD converter rated current: 31.0A.
Structure and function: Standard model.
Type: CA.
Substrate coating: have.
2 times the power consumption of the wind turbine and pump and the speed of the 3 power consumption is proportional to the speed of the rotating speed.
Through the speed control of the frequency converter to adjust the air flow, can reduce the power consumption
MR-J3-40B1
Give full play to the performance of the motor.
The excitation current is always adjusted to the best state, which can improve the efficiency of the motor.
Load torque is smaller, can further improve energy efficiency.
For example, when a general motor is used, the optimal excitation control mode in the 4% motor load torque is about 30% more than that of the V/F control. MITSUBISHI motor universal AC servo amplifier MELSERVO-J3 series.
Rated output: 15.0kw.
Interface type: SSCNET type III fiber communication.
Special features: integrated driver security.
Power specification: three phase AC200V.
STO function as a security feature is added to the SSCNET III fiber communication type servo amplifier.
By using the STO function, the electromagnetic contactor used in the past to prevent the motor from accidentally starting is no longer needed.
SS1 functions can be realized by using the MR-J3-D05 security logic unit.
MR-J3-BS uses a full closed loop control system.
Compatibility with MR-J3-B.
MR-J3-BS installation, wiring and connectors are the same as the MR-J3-B, so do not change the existing connection will be easy to MR-J3-B
Change to MR-J3-BS.
Security functions are connected to the CN8 interface through an external security circuit to increase the MR-J3-BS driver security.
Compatible full closed loop control system.
MR-J3-BS has a full closed loop control system version. Input and output points: 2048 points.
Input / output data points: 2048 points.
Program capacity: 30K.
Basic command processing speed (LD command) s:1.0.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage capacity: it is a measure of how much the user application can store the number of indicators.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.
MR-J3-40B1 Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=MR-J3-40B1&select=5