2 slots.
Installation of the power unit can not be used for AnS QnAS/ series units installed.
The popularization and application of PLC programming has been developed rapidly in our country,
It has been widely used in all kinds of mechanical equipment and production process of electrical control devices,
All walks of life have emerged a large number of application of PLC transformation of the results of the equipment A970GOT-TBA-CH Introductory Manual Manual A970GOT-TBA-CH Operating Manual
A970GOT-TBA-CH
Understand the working principle of PLC, have the ability to design, debug and maintain the PLC control system,
Has become the basic requirements of modern industry for electrical technicians and engineering students.
PLC user program is designed according to the control system of the process control requirements,
PLC programming language through the preparation of specifications, in accordance with the actual needs of the use of the function to design A970GOT-TBA-CH Introductory Manual Manual A970GOT-TBA-CH Operating Manual.
As long as the user can master some kind of standard programming language,
To be able to use PLC in the control system,
To achieve a variety of automatic control functions. Input voltage: AC100-240V.
Rated output: DC5V, 3A and DC24V, 0 A970GOT-TBA-CH Introductory Manual Manual A970GOT-TBA-CH Operating Manual. 6A.
The power supply module is connected with the external power supply, and the DC5V is provided with the AnS programmable controller,
They are inserted in the slot of the special power supply component on the base board,
The output of the DC5V is powered by the power supply on the substrate to the component.
The input voltage of the component is related to the selected model.
A1S61PN/62PN has Deng generation A1S61P/A1S62P, A1S61PEU/A1S62PEU. Input type: DC input, positive public end / negative public end.
Input points: 32 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 1 wire.
40 pin connector type (FCN connector type).
Through the 40 pin connector type (FCN connector type) can be connected to a variety of devices.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulationn debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A970GOT-TBA-CH Introductory Manual Manual A970GOT-TBA-CH Operating Manual A970GOT-TBA-CH Introductory Manual Manual A970GOT-TBA-CH Operating Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.