MITSUBISHI
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A970GOT-SBD Hardware Manual A970GOT-SBD User's Manual

MITSUBISHI A970GOT-SBD Hardware Manual A970GOT-SBD User's Manual

Brand: MITSUBISHI
Product model: A970GOT-SBD
Name: touch screen
Sort: User's Manual (Hardware)
File language: English
File size: 0.85MB
Cable length: 30 meters.
For connection between GOT and CRT. MELSECNET (II).
Coaxial circuit. CC-Link (remote device station).
Twisted pair. QnA/ACPU bus connection.
1 joint.
Applicable models: A985 (-V) /975/970/960/956 (W) GOT. Input points: 32 points.
Voltage: DC12/24V.
Current: 2.5/5mA.
Response time: 0 A970GOT-SBD Hardware Manual A970GOT-SBD User's Manual. 2ms.
8 points / a common end.
Positive / negative sharing A970GOT-SBD
38 point terminal station.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read A970GOT-SBD Hardware Manual A970GOT-SBD User's Manual.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode A970GOT-SBD Hardware Manual A970GOT-SBD User's Manual.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear. A0J2 56.
Input / output unit 2
MITSUBISHI PLC program simulation debugging
The basic idea oof program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program A970GOT-SBD Hardware Manual A970GOT-SBD User's Manual A970GOT-SBD Hardware Manual A970GOT-SBD User's Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
Related products
MITSUBISHI
10 inch man machine interface
A970GOT-LBA-EU
MITSUBISHI 10 inch man machine interface A970GOT-LBA-EU
Series Name: A975GOT. Size: 10 inches. Resolu
MITSUBISHI
10 inch man machine interface
A970GOT-LBD
MITSUBISHI 10 inch man machine interface A970GOT-LBD
Series Name: A975GOT. Size: 10 inches. Resolu
MITSUBISHI
10 inch man machine interface
A970GOT-TBA-B
MITSUBISHI 10 inch man machine interface A970GOT-TBA-B
Series Name: A975GOT. Size: 10 inches. Resolu
MITSUBISHI
6 inch man machine interface
A951GOT-SBD
MITSUBISHI 6 inch man machine interface A951GOT-SBD
Series Name: A951GOT. Size: 6 inches. Resolut