Input type: DC input, positive public end / negative public end.
Input points: 32 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC5V/4mA.
External connection: 1 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup.
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool.
No introductionInput type: DC input, positive public end / negative public end.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/7mA.
External connection: 1 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup MITSUBISHI AJ65SBTB1-32D5.
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool
AJ65SBTB1-32D5 Screw terminal table type.
Voltage / current output module.
Number of channels: 2 channels.
Number of stations: 1 stops.
Station type: remote equipment station MITSUBISHI AJ65SBTB1-32D5.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection MITSUBISHI AJ65SBTB1-32D5.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be. Input type: DC input, positive public end / negative public end.
Input points: 32 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 1 wire.
40 pin connector type (FCN connector type).
Through the 40 pin connector type (FCN connector type) can be connected to a variety of devices.
Can be installed along the 6 direction.
MITSUBISHI PLC prograam simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of thee program AJ65SBTB1-32D5 AJ65SBTB1-32D5.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.