MITSUBISHI
Home >> Products >> MITSUBISHI >> Ans/QnAs series PLC >> Input module >> A1SX10 | MITSUBISHI Input module A1SX10

A1SX10 | MITSUBISHI Input module A1SX10

MITSUBISHI A1SX10 Manual And Instructions
A1SX10 datasheetPDF datasheet
A1SX10 User's Manual

MITSUBISHI A1SX10 Product information and technical parameters:
Brand: MITSUBISHI
Name: Input module
Model: A1SX10
Input type: AC.
Input points: 16 points.
Input voltage: AC100-120V.
Input current: 6mA.
Connection mode: terminal row.
Common common point: 16.
The instruction list programming language is a programming language similar to assembly language mnemonic,
As well as assembly language by the operation code and the number of operations.
In the case of the computer for the PLC handheld programmer compile user program.
At the same time, the programming language of the instruction list corresponds to the ladder diagram programming language,
In PLC programming software can be converted to each other. Figure 3 is the instruction sheet corresponding to the ladder diagram of figure 2PLC.
The characteristics of instruction table programming language is used to represent mnemonic operation function,
Easy to remember, easy to grasp;
In the handheld programmer on the keyboard using the mnemonic representation, easy to operate, can be programmed in computer;
There is a one-to-one correspondence between the ladder diagram and the ladder diagram. Its characteristics are basically consistent with the ladder diagram language.

Axis of control: 1.
A1SD75 series components show the MITSUBISHI in the manufacture and design of CNC, frequency converter,
Integrated technical experience in servo system and PLC.
These components have a wealth of features that are sufficient to meet the highest requirements in the application of positioning control MITSUBISHI A1SX10.
A1SD75M, SCC net compatible controller, SSC network is the MITSUBISHI servo system control network A1SX10
In this network, the MR-H-13, MR-J-B, and MR-J2 servo amplifiers can be connected to a controller via a network system,
The connection is replaced by a pulse sequence and a voltage signal. Program memory capacity: 8k.
Input / output points: maximum 256 points.
A scan cycle of PLC must pass through three stages: input sampling, program execution and output refresh MITSUBISHI A1SX10.
PLC in the input sampling phase: first of all, in order to scan the sequence of all existing input latches in the input terminal of the state or input data read,
And write it into the corresponding input status register,
Refresh the input, then close the input port, enter the program execution stage. 10Mbps transmission speed, the computer as the support of the flexible manufacturing system at the plant level, the requirements of more and more data flow,
High transmission speed can be guaranteed to increase the amount of transmitted data while maintaining the minimum time to transfer and receive data between programmable controllers MITSUBISHI A1SX10.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on.
This phenomenon is called the I/O delay time effect.
Switch volume control is designed to,
According to the current inpuut combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order A1SX10.
So, sometimes also known as the order control.
And seqquential control is divided into manual, semi-automatic or automatic A1SX10.
And the control principle is decentralized, centralized and hybrid control three.


...More relevant models >>>>