MITSUBISHI
Home >> Products >> MITSUBISHI >> Ans/QnAs series PLC >> Temperature control module >> A1S64TCTRT | MITSUBISHI Temperature control module A1S64TCTRT

A1S64TCTRT | MITSUBISHI Temperature control module A1S64TCTRT

MITSUBISHI A1S64TCTRT Manual And Instructions
A1S64TCTRT datasheetPDF datasheet
A1S64TCTRT User's Manual
A1S64TCTRT HardwareUser's Manual

MITSUBISHI A1S64TCTRT Product information and technical parameters:
Brand: MITSUBISHI
Name: Temperature control module
Model: A1S64TCTRT
The most appropriate temperature regulation control (PID control) is possible,
In order to control the PID does not need to specify a special command.
In addition, according to the automatic regulation function,
The automatic setting of PID number is possible.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on.
This phenomenon is called the I/O delay time effect.

Input and output points: 512 points.
Input / output data points: 8192 points.
Program capacity: 28k.
Basic command processing speed (LD command) S:0.2.
PLC in the program execution stage: according to the order of the user program order to store the order of each instruction,
After the corresponding operation and processing, the result is written to the output status register,
The contents of the output status register are changed with the execution of the program MITSUBISHI A1S64TCTRT A1S64TCTRT
Output refresh phase: when all instructions are executed,
The output status register is sent to the output latch in the output refresh stage,
And through a certain way (relay, transistor or transistor) output, drive the corresponding output equipment MITSUBISHI A1S64TCTRT. 10Mbps transmission speed, the computer as the support of the flexible manufacturing system at the plant level, the requirements of more and more data flow,
High transmission speed can be guaranteed to increase the amount of transmitted data while maintaining the minimum time to transfer and receive data between programmable controllers.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on MITSUBISHI A1S64TCTRT.
This phenomenon is called the I/O delay time effect.
Switch volume control is designed to,
According to the current input coombination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order A1S64TCTRT.
So, sometimes also known as the order control.
And seqquential control is divided into manual, semi-automatic or automatic A1S64TCTRT.
And the control principle is decentralized, centralized and hybrid control three.


...More relevant models >>>>