Drive: MR-H_ACN series built-in positioning function.
Rated output: 3.5KW.
In servo drive speed closed loop,
Rotor speed measurement accuracy is very important to improve the dynamic and static characteristics of the speed control loop.
In order to seek the balance between measurement precision and system cost, incremental photoelectric encoder is generally used as the speed measuring sensor,
The corresponding method is M/T velocity measurement
HG-KR13J
Although the M/T measurement method has a certain measurement accuracy and a wide range of measurement,
But this method has its inherent defects,
Mainly includes: the measurement period must be detected at least one complete encoder pulse, limiting the minimum detectable speed.
2 control system for speed control of the timer switch is difficult to maintain synchronization,
Can not guarantee the accuracy of measurement in the situation where the speed change is larger.
Therefore, it is difficult to improve the speed tracking and control performance of servo drive by using the traditional speed loop design method. Cable length: 10m.
For MR-J2S-700A (4) /CP/CL or less.
Encoder for HC-SFS; HC-LFS; HC-RFS; 2000r/min HA-LFS; HC-UFS servo motor.
-H products have a long flex life.
Coding is not resistant to oil. DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
8 point /1 a public side.
Positive / negative sharing.
Output points: 8 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 5A/1 common end.
Response time: 12ms.
8 point /1 a public side.
Output form: relay output.
34 point terminal station.
Number of stations: 2 stops.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
HG-KR13J Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=HG-KR13J&select=5