"Database sharing.
FA integration solution "e-F@ctory" to achieve development, production, and maintenance of the various stages of the "TCO reduction" as the primary goal,
Effectively utilize advanced technology, optimize the environment of the factory, and explore the future of manufacturing industry.
As the core component of the "e-F@ctory" information sharing products, MES interface through the shared control system and IT system database,
Achieve production efficiency, product quality improvement
HC-SFS3524
The information collected from the production site is sent directly to the database.
Conditions can monitor the event data in the MES interface side, in the conditions established, send to the database information of work performance data of IT system.
In addition, the MES interface can be used to read data from the database, such as job instructions.
System construction costs reduced by 65%.
Through the use of MES interface, can be directly connected to the programmable controller and database, simplifying the system structure.
In addition, there is no need to use the gateway computer and the program at the time of connection, so compared with the past,
When the system is constructed, the work time and the time limit for a project are reduced. And, by using the high reliability of MES interface,
Can reduce the computer maintenance, maintenance costs. "SRAM memory card.
RAM capacity: 64KB. Protective film for 8.4 inch screen.
Transparent (frame: white), 5.
Applicable model: GT16. TFT color LCD touch screen to replace the backlight.
Applicable models: A975/970GOT-TBA, A975/970GOT-TBD. 3C-2V/5C-2V coaxial cable.
Double circuit.
MELSECNET (II) (Master / local station).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
HC-SFS3524 Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=HC-SFS3524&select=5