Manual pulse generator /INC synchronous encoder input:
Use number: 3 sets of /1 modules.
Convenient processing of large capacity data.
In the past can not achieve the standard RAM and SRAM card file register area of continuous access,
The boundary of each area should be considered in programming.
The SRAM 8MB extension card is installed in the high speed universal QCPU,
Standard RAM can be used as a continuous file register,
Capacity up to 4736K words, thus simplifying the programming
HC-MFS13B
Thus, even if the memory space of the soft element is insufficient,
Can also be installed by the expansion of SRAM card, easy to extend the file register area.
The address register is extended to 32 bits, which can be programmed to go beyond the traditional 32K word,
And to achieve the extension to the file register to all regions of the file register.
In addition, the processing speed of the index modification plays an important role in the efficient operation of structured data (array),
The speed has been improved.
When the index is used to modify the program repeatedly (e.g. from FOR to NEXT), the scan time can be reduced.Fast connector type.
Voltage input.
Number of channels: 8 channels.
Occupied the number of stations: Ver.1 mode occupied 3 stations, Ver.2 mode occupied 1 stations.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
HC-MFS13B Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=HC-MFS13B&select=5