Control axis: maximum 2 axes.
Operation cycle: 0.88ms.
Interpolation function: linear interpolation (maximum 4 axis), 2 axis arc interpolation.
Color signal: 2 points.
Color detecting set: 4 set.
Only need to use the PLC program can easily achieve synchronous control, cam control, speed and torque (push pressure control) and other advanced motion control.
Equipped with standard synchronous encoder and color detection function necessary function
GT15-AC12B
Can be no procedures for setting. Strong support for MELSOFT.
Can fully apply LD77MH of the old program.
Let motion control more simple. 8 slots.
Requires 1 power modules.
Used to install the old section of the large A series PLC module.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
GT15-AC12B Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=GT15-AC12B&select=5