For video input (NTCS/PAL) 4 channel / RGB input 1 channel composite input.
Applicable model: GT15. Analog input channel number: 8CH.
accuracy
Ambient temperature of 25 plus or minus 5 degrees C: plus or minus 0.1%.
Ambient temperature 0 ~ 55 degrees C:-.
Temperature coefficient: positive and negative 35ppm/.
Common
Conversion speed: 10ms.
Insulation between channels: isolation transformer insulation
FX5-8EYR/ES
Absolute maximum input: positive and negative 15V, 30mA.
External wiring connection mode: 40 pin connector.
Voltage input
The analog input voltage: DC - 10 - 10V.
Digital output value: 32000 ~ 32000.
Current input
Analog input current: DC0 ~ 20mA.
Digital output value: 0 ~ 32000.
Analog input module for the external analog signal into the interface of the programmable controller.
Can choose the channel between the insulation, voltage input, current input, voltage / current mixed input, thermocouple input, temperature resistance (RTD) input for a variety of purposes, such as modules.
Filter high frequency interference.
Analog input module has been equipped with a first order lag filter.
The analog input signal with high frequency interference component can be obtained by using the first order lag filter.
Parameters can be set through the filter time constant, no program can be easy to use.
Execute event driven program through alarm output
Strengthen the implementation of the interrupt function according to the alarm output flag, easy to carry out preventive maintenance.
The measured value and the change rate of the analog input signal exceed the upper and lower limits of the set,
Regardless of the procedure of the scan time, can be executed interrupt handling, quickly respond to abnormal conditions. CPU connection program input device.
ACPU use. Screw, 2 piece type terminal
Temperature measuring resistor body input module.
Number of channels: 4 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
FX5-8EYR/ES Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=FX5-8EYR/ES&select=5