MITSUBISHI motor universal AC servo amplifier MELSERVO-J3 series.
Rated output: 7.0kw.
Interface type: CC-Link communication type (built-in positioning function).
Power specification: three phase AC200V.
Positioning operation by setting position and rotational speed data in the positioning table and receiving the start signal from the main controller.
The setting of the position and speed of the positioning table, as well as the start and stop operation can be completed through CC-Link communication
AY11A
By using the MR-J3-D01 extension IO unit, the DI/O instruction can be used to select and locate the table.
(CC-Link can not be used for MR-J3-D01 communications).
With built-in positioning function of the servo amplifier, can be set through the CC-Link communications and speed data. (corresponding to the CC-Link version: Ver.1.10)
Can be achieved through the CC-Link communications to start, stop and monitoring and other operations.
Serial communication reduce wiring.
Distributed servo control system can be built by CC-Link communication.
The parameters of unit MR-PRU03 (optional) the parameter setting, operation and monitoring more convenient.
The servo amplifier can be used for speed control operation.
When the two stations are occupied, the speed can be set directly by the remote register. Input points: 32 points.
Voltage: AC200 ~ 240V.
Current: 10mA.
Response time: 25ms.
32 points / a common end..
38 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
AY11A Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=AY11A&select=5