Motor series: medium inertia, medium power.
Rated output power: 5.0kw.
Rated speed: 2000r/min.
Whether to bring the brakes: with.
Shaft end: Standard (straight).
Power supply: 400V type.
Protection level: IP65 (IP67).
Features: medium inertia from low speed to high speed three modes for selection, suitable for different applications.
Application examples: transmission machinery, robots, X-Y working platform
HG-JR6014
High resolution encoder 131072p/rev (17 bit).
The encoder with high resolution ensures excellent performance and stability at low speed.
All motor dimensions are the same as before and all are compatible with the wiring. Output points: 16 points.
Output type: leakage type.
Rated output voltage: DC12 ~ 24V.
Max load current: 0.5A/1 point.
Protection function: have.
Common way: 16 point / public end.
Input / output occupied points: 16 points (I/O distribution: output 16 points).
External wiring connection: 18 point terminal.
The switch input and output module is a device which can collect the input / output of the switch signal,
Digital I/O modules are often called.
The switch signal is collected to the computer or the computer to send the relevant instructions through the RS-485 bus to control the switch of the switch,
Can also be carried out through the RS-485 bus communication,
Remote control switch.
Communication protocol is a standard Modbus protocol or custom protocol. Screw terminal table type.
Voltage / current input module.
Number of channels: 4 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
HG-JR6014 Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=HG-JR6014&select=5