Motor series: low inertia, medium power.
Rated output power: 15.0kw.
Rated speed: 2000r/min.
Whether to take the brake: No.
Shaft end: Standard (straight).
Protection level: IP65 (IP67).
Features: low inertia from low speed to high speed, three modes can be selected, suitable for different application range. As a standard port, 30KW or greater power is suitable for flange (type) installation and support foot mounting
GT25-10PSGC
Application example: injection molding machine, semiconductor manufacturing equipment, large conveyor machinery.
High resolution encoder 131072p/rev (17 bit).
The encoder with high resolution ensures excellent performance and stability at low speed.
All motor dimensions are the same as before and all are compatible with the wiring. If can use: closed loop vector control; spindle positioning, position control, speed control, servo lock zero.
Suitable frequency converter: FR-A700. Cable length: 3 meters.
Connection between FX1N-232-BD and FXCPU for GOT expansion board. 2 channels.
10kpps.
Count input signal: DC5/12/24V.
External input: DC5/12/24V.
Output: DC12/24V, 0.5A.
38 point terminal station.
How to determine the input / output device of MITSUBISHI plc.
According to the control requirements of the system,
All input devices and output devices required for the determination of the system,
To determine the input / output device related to the MITSUBISHI PLC,
To determine the I/O PLC points.
Detailed analysis of the process and work characteristics of the controlled object,
To understand the coordination between the controlled object machine, electricity and liquid,
The control requirements of the controlled object for MITSUBISHI PLC control system are put forward,
Determine the control program, to develop a design task book. SI-200/250 fiber optic cable.
Double loop.
MELSECNET (II) (remote I/O station).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
GT25-10PSGC Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=GT25-10PSGC&select=5