MITSUBISHI
Home >> Price >> MITSUBISHI >> GT16H-CNB-42S Market price | GT16H-CNB-42S Introduction
Brand sort

MITSUBISHI GT16H-CNB-42S Market price | GT16H-CNB-42S Introduction

Country: JAPAN
Name: Connector adapter box for hand held GOT
Price: 0
MITSUBISHI GT16H-CNB-42S
Category: slave station.
Transfer speed: 125kbps/250kbps/500kbps/1Mbps.
Transmission line form: bus system.
Total distance: 125kbps:1000m/250kbps:800m/500kbps:480m/1Mbps:240m.
The maximum connection units: 32.
Total points: input + output <=2048 point.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add GT16H-CNB-42S
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations. Output points: 16 points.
Output type: leakage type.
Rated output voltage: DC12 ~ 24V.
Max load current: 0.5A/1 point.
Protection function: have.
Common way: 16 point / public end.
Input / output occupied points: 16 points (I/O distribution: output 16 points).
External wiring connection: 18 point terminal.
The switch input and output module is a device which can collect the input / output of the switch signal,
Digital I/O modules are often called.
The switch signal is collected to the computer or the computer to send the relevant instructions through the RS-485 bus to control the switch of the switch,
Can also be carried out through the RS-485 bus communication,
Remote control switch.
Communication protocol is a standard Modbus protocol or custom protocol. SI/QSI/H-PCF/ wide H-PCF optical cable double loop PC (control station / common station) / remote I/O network (remote master station).
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on.
This phenomenon is called the I/O delay time effect.
GT16H-CNB-42S Operation manual / Instructions / Catalog download link: /searchDownload.html?Search=GT16H-CNB-42S&select=5


...more relevant model market price >>>>
Related products
MITSUBISHI
External connection cable
GT16H-C30-42P
MITSUBISHI External connection cable GT16H-C30-42P
Cale length: 3m. Connection etween a c
MITSUBISHI
External connection cable
GT16H-C80-32P
MITSUBISHI External connection cable GT16H-C80-32P
Cale length: 8m. The connection etween
MITSUBISHI
External connection cable
GT16H-C30-32P
MITSUBISHI External connection cable GT16H-C30-32P
Cale length: 3m. The connection etween
MITSUBISHI
Stop switch guide
GT16H-60ESCOV
MITSUBISHI Stop switch guide GT16H-60ESCOV
Used to prevent accidental shutdown swit