MITSUBISHI
Home >> Price >> MITSUBISHI >> GT15-VHNB Market price | GT15-VHNB Introduction
Brand sort

MITSUBISHI GT15-VHNB Market price | GT15-VHNB Introduction

Country: JAPAN
Name: parts
Model: GT15-VHNB
Price: 0
MITSUBISHI GT15-VHNB
"2 axes, SSCNET III type.
2 axis linear interpolation.
2 axis arc interpolation.
Control unit: mm, inch, degree, pulse.
Location data: 600 data / axis.
40 pin connector.
Through the SSCNET III cable connection to save wiring, the distance between the station up to 50m.
Absolute position system for determining the origin position is supported by the return data set operation.
In addition, the limit switch of the upper limit, the lower limit switch and the near point block signal input can be directly connected to the servo amplifier,
Thus greatly reducing the wiring requirements GT15-VHNB
Easy to achieve high speed, high precision positioning control.
Support for multiple types of positioning control,
Including 2 ~ 4 axis 2 axis linear interpolation, circular interpolation, speed control and speed / position control, path switching control, constant speed control etc..
In addition, can use the "Configurator-QP GX" and other software,
Easy to set, monitor and debug. "MELSECNET/MINI (-S3) data link system, A2C system transfer converter.
Plastic fiber cable - plastic fiber cable.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
GT15-VHNB Operation manual / Instructions / Catalog download link: /searchDownload.html?Search=GT15-VHNB&select=5


...more relevant model market price >>>>
Related products
MITSUBISHI
Analog RGB cable
GT15-C50VG
MITSUBISHI Analog RGB cable GT15-C50VG
Cale length: 5m. The connection etween
MITSUBISHI
Bracket
GT15-90STAND
MITSUBISHI Bracket GT15-90STAND
Support for 15 inch. Applicale models:
MITSUBISHI
Small CPU extension cable
GT15-A1SC50NB
MITSUBISHI Small CPU extension cable GT15-A1SC50NB
Cale length: 5.0m. For the connection
MITSUBISHI
Large CPU expansion cable
GT15-AC50B
MITSUBISHI Large CPU expansion cable GT15-AC50B
Cale length: 5.0m. For QnA/ACPU/ motion