MITSUBISHI general purpose AC servo amplifier MR-J2 series.
Rated output: 3.5kw.
Interface: single axis positioning built-in type.
Voltage: three phase AC200V.
High response.
High precision positioning.
High level automatic tuning, can easily achieve gain settings.
Adopting adaptive vibration control and reducing vibration.
With a computer combination, using the software to achieve the best tuning
GT10-20PCO
Pulse sequence input (position, speed control), analog input (speed, torque control) two purposes.
Simple operation.
The socket is arranged on the front panel, and is convenient to connect.
Using the socket, wiring easy.
Setting method and J2Super with interchangeable. Input points: 32 points.
Voltage: AC100 ~ 120V.
Current: 12mA.
Response time: 25ms.
32 points / a common end.
38 point terminal station.
CE certification.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
GT10-20PCO Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=GT10-20PCO&select=5