MITSUBISHI
Home >> Download >> MITSUBISHI >> Catalog Download >> MITSUBISHI A6TE2-16SRN datasheet PDF catalog A6TE2-16SRN PDF datasheet

MITSUBISHI A6TE2-16SRN datasheet PDF catalog A6TE2-16SRN PDF datasheet

Brand: MITSUBISHI
Product model: A6TE2-16SRN
Name: Relay terminal module
Sort: PDF datasheet
File language: English
File size: 20.52MB
10BASE-T.
When communicating in the PLC network of MITSUBISHI,
There is no sense of difference and discontinuity in the network,
Can carry on the remote monitoring, modification, debugging and other work of data communication and program,
Without taking into account the level and type of network.
MELSECNET/H and CC-Link use the way of loop communication,
Periodically automatically send and receive messages,
Does not require specialized data communication procedures,
Simple parameters can be set A6TE2-16SRN datasheet PDF catalog A6TE2-16SRN PDF datasheet A6TE2-16SRN
MELSECNET/H and CC-Link are used to transmit and receive the broadcast mode,
This can be done on the network data sharing.
For the use of Ethernet, MELSECNET/H, CC-Link network,
Can set the network parameters and various functions, simple and convenient in the Developer GX software screen A6TE2-16SRN datasheet PDF catalog A6TE2-16SRN PDF datasheet. Pulse input: differential input.
Preset input: differential input.
Count range: 0~16777215.
Number of stations: 4 stops.
Station type: remote equipment station.
Configuration of master / local station,
In addition to the other site network with different CC-Link in addition to the main station and the remote station configuration can also be the main station and the local station configuration A6TE2-16SRN datasheet PDF catalog A6TE2-16SRN PDF datasheet.
A local PLC can communicate with the master station PLC and other remote workstations.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debuggging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp by step A6TE2-16SRN datasheet PDF catalog A6TE2-16SRN PDF datasheet A6TE2-16SRN datasheet PDF catalog A6TE2-16SRN PDF datasheet.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
Related products