MITSUBISHI A975GOT-TBA-CH Manual A975GOT-TBA-CH User's Manual

Brand: MITSUBISHI
Product model: A975GOT-TBA-CH
Name: touch screen
Sort: User's Manual
File language: English
File size: 5.11MB
Adapter for mounting rails. Unit connection CPU unit.Cable length: 0.33 meters.
Extending cable to connect CPU main substrate and extended substrate,
According to the model can provide different cable length,
If you need to connect the AnN type expansion substrate is required,
Selection of A1SC05NB (A1SC07NB) cable A975GOT-TBA-CH Manual A975GOT-TBA-CH User's Manual. Fast connector type.
Voltage input A975GOT-TBA-CH
Number of channels: 8 channels.
Occupied the number of stations: Ver.1 mode occupied 3 stations, Ver.2 mode occupied 1 stations.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram A975GOT-TBA-CH Manual A975GOT-TBA-CH User's Manual.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced A975GOT-TBA-CH Manual A975GOT-TBA-CH User's Manual.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be. Fiber optic cable / twisted pair cable.
Single bus.
Control unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, tthe general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system A975GOT-TBA-CH Manual A975GOT-TBA-CH User's Manual.
The main contents of the initialization program arre: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A975GOT-TBA-CH Manual A975GOT-TBA-CH User's Manual. .