MITSUBISHI
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A970GOT-TBA-B Hardware Manual A970GOT-TBA-B User's Manual

MITSUBISHI A970GOT-TBA-B Hardware Manual A970GOT-TBA-B User's Manual

Brand: MITSUBISHI
Product model: A970GOT-TBA-B
Name: touch screen
Sort: User's Manual (Hardware)
File language: English
File size: 0.85MB
2 slots.
Installation of the power unit can not be used for AnS QnAS/ series units installed.
The popularization and application of PLC programming has been developed rapidly in our country,
It has been widely used in all kinds of mechanical equipment and production process of electrical control devices,
All walks of life have emerged a large number of application of PLC transformation of the results of the equipment A970GOT-TBA-B Hardware Manual A970GOT-TBA-B User's Manual A970GOT-TBA-B
Understand the working principle of PLC, have the ability to design, debug and maintain the PLC control system,
Has become the basic requirements of modern industry for electrical technicians and engineering students.
PLC user program is designed according to the control system of the process control requirements,
PLC programming language through the preparation of specifications, in accordance with the actual needs of the use of the function to design A970GOT-TBA-B Hardware Manual A970GOT-TBA-B User's Manual.
As long as the user can master some kind of standard programming language,
To be able to use PLC in the control system,
To achieve a variety of automatic control functions. 10BASE-T.
The structured text programming language uses the computer description method to describe the various kinds of relations between the various variables in the system,
Complete the required function or operation A970GOT-TBA-B Hardware Manual A970GOT-TBA-B User's Manual.
Most PLC manufacturers use structured text programming language similar to BASIC language, PASCAL language or C language and other advanced languages,
But in order to be convenient, the expression methods of the statement and the types of statements are simplified.
Structured text programming language features: the use of high-level language programming, you can complete the complex control operations,
Need to have a certain level of computer knowledge and programming skills,
Higher requirements for engineering designers. Poor visibility and operability.
Switching value, also known as logic, refers to only two values, 0 or 1, ON or OFF.
It is the most common control, it is the advantage of PLC control,
Is also the most basic application of PLC.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
PLC is introduced by the relay control technology after the development of micro processing technology,
Can be easily and reliably used for switching control.
As the analog quantity can be converted into digital quantity, the number of digital quantity is just a number of switching value,
Therefore, after the conversion of analog, PLC can also be reliable for processing control.
Because the continuous production process often has the analog quantity, the analog quantity control is sometimes called process control.
Analog quantity is not electricity, and PLC can only handle digital quantity, quantity of electricity.
All to realize the conversion between them to have the sensor, the analog quantity into a number of power.
If this power is not standard, but also through the transmitter,
The non-standard power into a standard electrical signal, such as 1-5V, 4-20mA, 0-10V, etc..
At the same time, there is also an analog input unit (A/D),
Transform these standard electrical signals into digital signals,
The analog output unit (D/A), in order to transform the digital quantity after PLC processing into analog quantity -- standard electric signal.
So the standard telecommunication number, the conversion between the number of operations to use a variety of computing.
This requires the resolution of the analog unit and the standard electrical signal.
The length of ttime required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, tthe fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of A970GOT-TBA-B Hardware Manual A970GOT-TBA-B User's Manual A970GOT-TBA-B Hardware Manual A970GOT-TBA-B User's Manual.
Related products
MITSUBISHI
10 inch man machine interface
A970GOT-SBA
MITSUBISHI 10 inch man machine interface A970GOT-SBA
Series Name: A975GOT. Size: 10 inches. Resolu
MITSUBISHI
10 inch man machine interface
A975GOT-TBA-B
MITSUBISHI 10 inch man machine interface A975GOT-TBA-B
Series Name: A975GOT. Size: 10 inches. Resolu
MITSUBISHI
10 inch man machine interface
A970GOT-SBA-EU
MITSUBISHI 10 inch man machine interface A970GOT-SBA-EU
Series Name: A975GOT. Size: 10 inches. Resolu
MITSUBISHI
10 inch man machine interface
A970GOT-TBA-EU
MITSUBISHI 10 inch man machine interface A970GOT-TBA-EU
Series Name: A975GOT. Size: 10 inches. Resolu