MITSUBISHI
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A970GOT-TBA Manual A970GOT-TBA User's Manual

MITSUBISHI A970GOT-TBA Manual A970GOT-TBA User's Manual

Brand: MITSUBISHI
Product model: A970GOT-TBA
Name: touch screen
Sort: User's Manual
File language: English
File size: 5.11MB
Input type: DC input, positive common end.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 4 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program A970GOT-TBA Manual A970GOT-TBA User's Manual A970GOT-TBA
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Data format: RTU A970GOT-TBA Manual A970GOT-TBA User's Manual.
Data bits: 8.
A1SJ71UC24-R2-S2 and A1SJ71UC24-R4-S2 allow the Ans series PLC to be connected to the MODBUS network,
As the network from the station, and in accordance with the instructions of the main station of the CPU Ans user storage area for data reading / writing.
In addition to supporting the MODBUS protocol, these components also support the standard dedicated communication protocol for A1SJ71UC24 components A970GOT-TBA Manual A970GOT-TBA User's Manual.
This feature makes the main station of the data acquisition and control with more flexibility.
Support MODBUS slave station protocol.
Supports 1 to 21 function code.
Two transmission modes: RTU or ASCII. A pack of 20.
Applicable models:
AJ65SBTC - - - type remote I/O module.
AJ65VBTCU - - - type remote I/O module.
AJ65VBTCU- - type remote I/O module. Program memory capacity 14K.
Input and output points to the maximum 512 points.
A scan cycle of PLC must pass through three stages: input sampling, program execution and output refresh.
PLC in the input sampling phase: first of all, in order to scan the sequence of all existing input latches in the input terminal of the state or input data read,
And write it into the corresponding input status register,
Refresh the input, then close the input port, enter the program execution stage. Screw, 2 piece type terminal
Thermocouple Input module.
Number of channels: 8 channels.
Number of stations: 4 stops.
Station type: remote equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiiring diagram A970GOT-TBA Manual A970GOT-TBA User's Manual.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program deesign and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced A970GOT-TBA Manual A970GOT-TBA User's Manual.