MITSUBISHI
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A953GOT-LBD-M3 Introductory Manual Manual A953GOT-LBD-M3 Operating Manual

MITSUBISHI A953GOT-LBD-M3 Introductory Manual Manual A953GOT-LBD-M3 Operating Manual

Brand: MITSUBISHI
Product model: A953GOT-LBD-M3
Name: touch screen
Sort: Operating Manual (Introductory Manual)
File language: English
File size: 0.85MB
Enter points: 64 points.
Input voltage: DC7V above.
Input response time: 16ms.
16 pin connector.
Output points: 64 points.
Output response time: 16ms.
Output type: transistor output.
32 pin connector.
Dynamic input and output.
Control solenoid valve required I/O points by the action principle of the solenoid valve can be known,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points A953GOT-LBD-M3 Introductory Manual Manual A953GOT-LBD-M3 Operating Manual A953GOT-LBD-M3 Introductory Manual Manual A953GOT-LBD-M3 Operating Manual A953GOT-LBD-M3
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor A953GOT-LBD-M3 Introductory Manual Manual A953GOT-LBD-M3 Operating Manual.
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc..
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points. Points: 32 points
.
Rated voltage: DC24V.
Connection type: connector
.
Three remote components can be connected to the CC-LINK system.
Remote I/O: refers to those who require only the ON/OFF control function of the field components, such as digital I/O or pneumatic valve, etc..
In this type of communication can only be carried out in the bit data.
Remote components: refers to those that require processing of the register data of the field components, such as analog I/O and counters, etc..
IIn this type of component, in addition to the bit data can be carried out in the register data communication A953GOT-LBD-M3 Introductory Manual Manual A953GOT-LBD-M3 Operating Manual.
Intelligent remote: this type of component is to allow the main sstation or other stations to access the action, to collect data and control the local PLC station,
GOTS and programmer interface unit are of this type A953GOT-LBD-M3 Introductory Manual Manual A953GOT-LBD-M3 Operating Manual.
Related products