MITSUBISHI
Home >> Download >> MITSUBISHI >> Manual Download >> MITSUBISHI A951GOT-SBD-M3-B Hardware Manual A951GOT-SBD-M3-B User's Manual

MITSUBISHI A951GOT-SBD-M3-B Hardware Manual A951GOT-SBD-M3-B User's Manual

Brand: MITSUBISHI
Product model: A951GOT-SBD-M3-B
Name: touch screen
Sort: User's Manual (Hardware)
File language: English
File size: 0.85MB
Series Name: A985GOT.
Size: 12 inches.
Resolution: 800 * 600.
Display equipment: high brightness TFT color display.
Display color: 256 color.
Power supply: AC100-240V.
Authentication: UL/cUL/CE.
Man machine interface (Machine Interaction Human, referred to as HMI), also known as the user interface or user interface,
Is a communication interface between human and computer,
Is an important part of the computer system A951GOT-SBD-M3-B Hardware Manual A951GOT-SBD-M3-B User's Manual A951GOT-SBD-M3-B
Is a medium for interaction and information exchange between the system and the user,
It realizes the transformation between the internal form of information and the acceptable form of human being.
Where there is a man-machine interface in the field of human computer information exchange A951GOT-SBD-M3-B Hardware Manual A951GOT-SBD-M3-B User's Manual. Input type: DC input, positive common end.
Input points: 16 points.
Enter the response time: 0.2ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 3 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program A951GOT-SBD-M3-B Hardware Manual A951GOT-SBD-M3-B User's Manual.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. 3C-2V/5C-2V coaxial cable between double loop PC (control station / common station) / remote I/O network (remote master station).
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on.
This phenomenon is called the I/O delay time effect.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of tthe input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order A951GOT-SBD-M3-B Hardware Manual A951GOT-SBD-M3-B User's Manual.
So, sometimes also known as the order control.
And seqquential control is divided into manual, semi-automatic or automatic A951GOT-SBD-M3-B Hardware Manual A951GOT-SBD-M3-B User's Manual.
And the control principle is decentralized, centralized and hybrid control three.
Related products
MITSUBISHI
6 inch man machine interface
A951GOT-TBD
MITSUBISHI 6 inch man machine interface A951GOT-TBD
Series Name: A951GOT. Size: 6 inches. Resolut
MITSUBISHI
6 inch man machine interface
A951GOT-QTBD
MITSUBISHI 6 inch man machine interface A951GOT-QTBD
Series Name: A951GOT. Size: 6 inches. Resolut
MITSUBISHI
6 inch man machine interface
A951GOT-QLBD
MITSUBISHI 6 inch man machine interface A951GOT-QLBD
Series Name: A951GOT. Size: 6 inches. Resolut
MITSUBISHI
6 inch man machine interface
A951GOT-LBD
MITSUBISHI 6 inch man machine interface A951GOT-LBD
Series Name: A951GOT. Size: 6 inches. Resolut